Opening Piping Foreman Korea (South) STB-DJL Human Link Inc.

STB-DJL Human Link Inc.– Is now open application for qualified applicant for full time Piping Foreman job position for Korea (South). If you are willing to apply for this job position, you can visit to the office of POEA recruiting agency stated below.

Requirements:

  1. Candidate must possess at least a Bachelor’s/College Degree in Engineering, or equivalent.
  2. Must have at least 3 years Overseas Experience
  3. With good Oral Communication Skills.
  4. Can easily understand instruction and work under minimum supervision.
  5. Having Oil, Gas, Refinery and Petrochemical Experience is an advantage.
  6. Full-Time position(s) available.

POEA Accredited Agency: STB-DJL HUMAN LINK INC (FORMERLY DJL MANPOWER INC) Landbased Agency
Location address: 1011A & B REMEDIOS COR MODESTO STS MALATE, MANILA
Telephone Numbers: /5214875/5267487/ 5216636/5230378
Email Address: djl@thenet.com.ph
Website: www.stb-djl.com.ph
Official Representative: ANGELITA V. CASTILLO
Status: Valid License
License Validity: 2/25/2012 to 2/24/2016

This entry was posted in 2012 Jobs, Engineer, Korea and tagged , , , . Bookmark the permalink.

One Response to Opening Piping Foreman Korea (South) STB-DJL Human Link Inc.

  1. paculba daniel says:

    PACULBA DANIEL B.
    Email Add: dhaniel_paculba@yahoo.com

    Contact No: +639081030697/+639052757180/+639213701639

    ERECTION/PIPING FOREMAN/PIPEFITTER
    PERSONAL DATA
    City Address : 2159 Pitimini St. Pleasant View Subd. Bagbaguin Caloocan City
    Provincial Address : Lao Sta. Cruz Plaridel Misamis Occidental
    Date of Birth : June 4, 1971
    Place of Birth : Lao Sta. Cruz Plaridel Misamis Occidental
    Height : 5’6”
    Weight : 76 kls..
    Religion : Roman Catholic
    Civil Status : Married
    Citizenship : Filipino
    Sex : Male
    Passport ; XX4037663
    Seaman Book ; B0784992

    EDUCATIONAL ATTAINMENT
    Elementary : Sta. Cruz Elementary School
    Plaridel Misamis Occidental
    High School : Saint Nicholas High School
    Plaridel Misamis Occidental
    Vocational : None
    College : University of Cebu
    Cebu City, Philippines
    Course : Bachelor of Science in Marine Engineering/
    Special Skills : Pipe Fitter/ welding,/ Structural, Rigger, Fabrication/foreman

    TRAINING CERTIFICATE;

    Technical Education and Skills ;National Certificate (NC)11 Pipefitting;;Certificate NO. 11130502014207 May 20.2011
    The Maritime Training Center; Basic Safety Training; Certificate No.BR05-370-09
    May 20.2009
    Southern Institute of Maritime; Proficiency in Survival Craft and Rescue Boats;
    Certificate No.MPSC-105-10-8714 .May 24/27 /2010
    Southern Institute of Maritime; Ship Security Awareness; Certificate No.MISPS-069-10-
    5301.May 21.2010
    Transnational Institute of Learning ; Shielded Metal Arc Welding (SMAW) NC 11
    Certificate No.023 June 21 to 02 July /2010
    Basic Safety Training and Instruction; Certificate No.14-431251B July 13/2010

    Certificate of Competency; Certificate No.09131100036084 Nov.20.2009
    Ge0graphe Energy Ingenuity at Work. March 18.2010
    John MC Gregor Marineweld Inc. Basic Lathe Machine .Course certificate No.LM-1000202
    October 19 to 23.2009
    John MC Gregor Maritimeweld Inc . Marine Fitter/ Welder .Certificate No.SF-783209
    October 09 2009
    Incident and Injury-Free. Training Course. September 30 to November 16.2007

    WORK HISTORY

    Aprel/05.2011 /Feb,08/2012 Kentz Eng,g & Constructors Kents MEPC (MALAYSIA)
    SDN BHD Png Lng Project-EPC4,hides gas conditioning
    Plant hides CHGCP&hides well pads
    Client;CBI Clough Joint Venture C/ESSO Highland LTD.
    Png Project Papua New Guinea

    Position ;Piping foreman

    Job Descrition;
    Preparation tools &materials &install of piping at ground level and along the
    Bracket line cut pipe to size copper tube and fixtures cut untruth and fix to plinth.
    Installation of metal bracket and water test line and install hot/cold water lines.
    And equipment underneath modules.

    Installation of wash hand basins toilets and pipe work drill timber for holes for drain lines
    Install fire reel and lay water lines drilling and bolting of support for the 25mm dia. pipe.
    And pump out overflow tank repair leaks and fabricate drain lines for dryers and drill
    Hole for drain line
    Installed water supply line for ice maker machine working underneath the kitchen building fit- up for 25mm super pipe with male socket super pipe clip unfix clamp with
    Nut and bolt and pvc reducing bush copper flexible and elbow gate valve and pvc pipe

    August 26.2010 /March.11.2011 United Holding/ Hail Lick Engineering PTL Ltd.
    No.12 Teas Drive 1 Singapore 2263.

    Potion piping foreman

    Job Description.

    Study and analyses for fabrication and erection and structural pipe rack and piping and support coordinates with engineer regarding to revisions and modification and discrepancy on issued for fabrication drawing.fit up responsible for preparation of all fabrication piping fit-up assembly responsible for checking materials as per specification and drawing. To be used for fabrication as structural pipe support responsible for lay out cutting as per materials and plan required in fabrication coordinates with pipefitter welder and 12’’asphalt line pipe supports and pad shoes and guide and anchor are in process and
    Revising plan to re issue by mid of next week. And attached advance copy of related isometric and all pipe support and steam tracer and isometric drawing.

    March 12. 2010./May 18.2010 Cape East phil./Conoco Phillip.
    Off Shore Shut Down Project
    Bayun-dan Estimor
    Position Pipefitter

    Job Description.

    Preparation tools and materials and drawing and isometric drawing fit-up and alignment of pipe and erection and assembly of structural pipe rack and erection of pipe and valve fabrication and fit-up of concentric reducer and eccentric reducer and blind flange alignment of pipe support and removing and installs of pipe and bolt flange alignment of flange bolt and gasket and lay out and assembling of structural and erection.
    Measuring and preparing pipe for fabrication and installation and bending steel and stainless steel pipe to given dimensions fitting up flanges for welding.

    May 16, 2008 / July 18. 2009 Goro Nickel Project / E.E.I Corporation of New
    Caledonia / Inco Australia

    Position : Piping foreman

    Job Description

    A. Preparation all tools and materials this ARE # 260. 270. 255. 245. 275. Fit-up and Erection fiber resins pipe and steel pipe and alignment and erection of storage tanks for process solution chloride and steel pipe Blind flange and speed blind bolt gasket for testing for water filling and water flushing check the man way overflow. Have specified gasket and blind flanges all nozzles have gasket flange cover for water filling for protection only.
    Erection for another work pipe and fit-up for connecting for storage bank 1, 2, 3, 4, and 5. For process solution chloride and alignment and fit-up and erection 8” 6” 4” 2” 10” of pipe and installed for butterfly valve gasket. blind flange and stud bolts and nuts and spools of pipe and support and alignment checking the line and drawing and materials for a final inspection. GCT Recommended or required skill includes physical strength and manual dexterity. reading and interpreting blueprints and specifications making detailed sketches for pipe and equipment fabrication and installation and cutting opening for pipe using various hand or power tools measuring cutting with blades and torches threading grooving bending soldering brazing welding assembling mitering joining and installing pipes valve and fittings.

    August 10, 2007 to January 24, 2008 Washington Group International
    Al Jabber Energy Services
    Ras Laffan Industrial City State of Qatar
    Position : Piping and Structural Foreman

    Job Description

    Preparation of materials and handling of scabbing the top off foundations shim plate fixing and pre assembly and erection of unity pipe rock. Preparation of tools and materials hauling and fabrication base plate and lifting pad eye for erection module 1. 2 and 3 unloading and pre assembly of pipe rack structure on wooden sleepers and erection grids and secure each grid with wires to concrete blocks and chain black chain pullers erection of connecting members and fit-up and alignment to utility line nitrogen line steam line and fabrication of pipe support installation of valve and gasket bolt and support maybe be designated according to type of system installed as a pipe fitter
    Ammonia construction pipefitter fire-sprinkler system construction pipefitter gas
    Pipe construction or type of piping used as pipefitter plastic pipe soft copper and
    Construction may be designated airdrop fitter mine and quarry fright-air-brake

    November 4, 2006 to July 27, 2007 Sonamet Lobeto Angola Africa
    Off shore Project / Oil and gas
    Position : Piping foreman

    Preparation of piping Initial structure for piping duplex pipe see drawing black is –GP –S – PL – DTL 0917 and initiation side and special double joint. See AND Alignment header and installation of J-lay tower to be removed before welding pipe 12”, 24”, 10” and swivel flange RTJ 5000 PSI / 456 kilos See the drawing black and fit-up and installation of spool catcher and base plate FTA fastening initiation pad eye spool catcher axis 70 DJ 14 plate 20mm thick guide machine FD. 25 linear and sliding frame and lifting pad eye for mud mat handling on yard and fit-up for plate 8mm thick slot wag kizomba.c stag wag manifold large bore / small bore pipe and Lay out assembles installs and maintains pipe systems pipe supports and related Hydraulic and pneumatic equipment for steam, hot water he4ating cooling lubricating Sprinkling and industrial production and processing system operation and following Blueprints selects type and size of pipe and related of materials and equipment and support hanger and hydraulic cylinders.

    July 25, 2005 to July 25, 2006 Nasser Al Hajre Co. Ltd.
    ORYX –GTL Project, RASLAFFAN
    Industrial City State of Qatar
    (Joint Venture of Qatar Petroleum and Sasol,
    South Africa)
    Position Pipingforeman

    Job Description

    Preparation for erection to all materials of acid into mixed bed polisher and a mixed polisher b and fit-up 8” 10” 4” 2” 3” 1” 12” pipe for another line spent requirement line from mixed bed polisher and acoustic line and water block desalinated water recycle and installation for to unit 126 Jug Water tank erection and fit-up and alignment installation for utility line to bisulfate tank and air line 96% sulfur acid line ¾ to unit 129 caustic soda from unit 146 Preparation for another work tools drawing and handling and materials of Supply and spools belt up to flange gasket blind flange valve for primary service in hiker line and mixed bed polisher a face piping A and B and mixed bed polisher B interconnect to mixed bed polisher and a mixing air blower line assembles and installs of valve of metal and nonmetals pipe tubes and fittings including of iron steel copper and plastic connects pipes using threaded Caulked soldered brazed fused or cemented joint and hand tools secures pipe to structure with brackets clamps and hanger using hand tools and power tools installs and maintains hydraulic and pneumatic components of machines and equipment such as pumps and cylinders using hand tools and maintains refrigeration and air conditioning system and pumps meters pneumatic and hydraulic controls and piping using hand tools and power tools and following specification and blueprint increases pressure in pipe system and observes connected pressure gauge to test system for leak and weld pipe support to structural steel members

    November 20, 2004 / May 6, 2005 : DSEC Company Limited
    Asa Loye, Iran
    9th Olefins Cracker Plant Project
    Position : Pipe Fitter
    Job Description

    Preparation of tools and drawing and materials expedites the materials of the different group for supporting materials and preparation . Checking the drawing for laying pipe for fit-up or 36” 40” 60” 80” and 120” diameter CWR and CWS sea water line and fabrication of 10mm plate as blind cover of the1270mm radius pipe fit- up tack and welding on the half –v-bel created on the pipe and erection of pipe 80’’60’’ 36’’ 40’’and pipe laying and fit up and alignment.

    January 29, 2003 / April 5, 2004 : EEI / ARCC Al Rushed Const. Corp.
    AL KHOBAR KSA
    Berri Gas Plant Project
    Position : Pipefitter

    Job Description
    Preparation of tools for fabrication and grander drawing and materials preparation of spools pipe and chain block for rig-up for erection for pipe spools and control air system for fit-up and installed the valves and the correct gasket and also the bolts nuts erection the water line of the boiler and rig-up hanging support for checking the line are complete support and valve. flange .gasket and bolts inspection for QC. Preparation for another work expedites the materials and checking to be sure that all line complete fittings are installed is correct including the bolt and gasket fit-up and rig-up of steam supply flange valve for final bolting for inspection for ARAMCO QC.

    April 8, 2001 to December 22, 2002 : EEI / ARCC AL – Rushed Const. Corp.
    Al Khobar KSA
    Ghazlan Power Plant Project
    Rastanura, KSA
    Position pipefitter

    :
    Job Description

    Checking the drawing and the complete materials and spools sling cable and chain block for erections fit-up for steam line and installations of (lines) valves and fabrication fit-up and rig-up of spools and elbow 90” 20” and handling support and valve flange gasket nut and bolts. Erection the water wall of the boiler line installed the pipe steam drum. Steam tracing installation and fabrication of support of exhaust system producing of all types of pipes boiler and spiral of longitudinal for all lines and fit-up of heavy wall pipe and flange and valve “20” and installed the pipe and support. Erection another work and fit-up of heavy wall pipe cold reheat line and hot reheat line and steam line installed and erection the water line of the boiler installed the pipe line of steam drum.

    September 29, 1999 to March 20, 2000 EEI CORPORATION
    MRT2 MITSUBISHI PROJECT
    Quezon City Philippines
    Position : Pipe Fitter

    Job Description:

    Assist for another work provides the packer plate activities include leveling and elevation of packer plate also check the strength by testing and hammer Expedites the materials of the different groups and cleaning of bolts and valve flange steam line and steam tracing installation and fabrication of exhaust system and erection and installation of valve and erection of air plant and nitrogen plant and horizontal and dummy pipe and support and erection of structural I beam and alignment of member and bolting checking of materials.

    July 15, 1994 – March 22, 1996 EEI CORPORATION
    D.S.M.C Davao City
    Darong Toril Davao City
    Position : Pipe Fitter

    Job Description:

    Erection the water wall of the boiler installed the pipeline of steam drum steam tracing installation and fabrication of exhaust system producing of all types of pipes boiler and spiral of longitudinal for oil lines. Erection and fit-up of heavy wall pipe and valve and installed the pipe and support. Prepared tools and materials for fit-up and erection of valve.
    for inspection and erection.

    November 26, 1997 to August 10, 1999 EEI CORPORATION
    POWER PLANT PROJECT
    Mau ban Quezon Province Philippines
    Position : Pipe Fitter

    Job Description.

    Fit –up and fabrication of spools and erection of pipe and alignment
    Installation of spools steam line and valve gasket bolt and support
    Installed nitrogen line water line steam and erection